NCC 2022's fire compartment regime is a building-code compliance framework, but the thresholds it sets reveal implicit decisions about acceptable risk that the code's own Performance Requirements leave open to challenge. The DtS pathway locks in prescriptive limits that favour certain construction types and project scales, while the Performance Solution route allows — and demands — deeper scrutiny of those defaults. The Large Isolated Building pathway is effectively a negotiated trade: exceed the table limits, but surrender perimeter autonomy.
Evidence
- The maximum compartment sizes under NCC 2022 Table C3D3 (Class 7 and 8 buildings) run as follows, per both Builtwiseconstruction and KEVOS published analyses: Type A construction — 5,000 m² floor area / 30,000 m³ volume; Type B — 3,500 m² / 21,000 m³; Type C — 2,000 m² / 12,000 m³.
- Beyond those thresholds, NCC 2022 C3D4 activates the Large Isolated Building (LIB) pathway, confirmed by Jensen Hughes' Pacific practice as a specific DtS compliance route.
- The unspoken tension here, which fire engineers working under Performance Solutions regularly surface, is that the DtS compartment limits were calibrated for manual firefighting intervention times that may not reflect actual brigade response in peri-urban or industrial corridors.
- This is not merely passive containment; it is a legal boundary that determines insurance liability, emergency response strategy, and evacuation design simultaneously.
- Both the area and volume limits apply concurrently — a detail practitioners frequently miss at the design stage.